Welcome to visit the website of Xinruizhen (Xiamen) Purification Technology Co., Ltd.

City substation Online message 中文

Service Hotline:
0592-7310273

Top search terms: Purification Project dust-free workshop Clean Workshop

Contact Us

Support Hotline:0592-7310273

Technical Consulting:15159259527
Contact Email:15159259527@139.com
Contact Address:Room 412, Kechuang Building, Haicang Science and Innovation Center, No. 289, Wengjiao Road, Xinyang Industrial Zone, Haicang, Xiamen

Air Shower (Cargo Shower)

  • Product Description

Important reminder: the air shower belongs to indoor equipment, do not use in the outdoor.

1. Be careful not to wipe the body with volatile oil and thinner.

2. When using, try not to use it in the following places: low temperature, high temperature, wet, dew, dust and lampblack, fog. Finally, technical experts will pay attention to one point in the process of operation: do not knock, impact glass, so as not to cause personal injury, to ensure that the maintenance space in order to facilitate the replacement of filters and electrical components, line maintenance.

3. After the electrical of the purification project is in place, it should be adjusted to the level as far as possible and then wired and connected.

4. Confirmed whether the rated voltage and frequency of the product are consistent with the parameters of the input power supply, so as to avoid damage to electrical components and fire.

5. Please do not plug or unplug the power plug with wet hands to avoid electric shock. Be sure to plug the power plug into the socket with an earthing wire.

Air purification engineering air shower is a kind of purification equipment to provide a local high cleanliness working environment. When people pass through the air shower room, the high intensity clean air flow in the air shower room is blown to the human body, and the dust on the body is blown away by the wind. At the same time, it also plays the role of airlock to prevent the air flow from entering the clean area without purification. It can be widely used in electronics, national defense, precision instruments, meters, pharmaceutical, microorganism, food processing and other fields. Purification engineering stroke shower room is the main energy consumption of the air shower fan, the air shower fan through the adjustment of external time to achieve different season of energy control in the front has been described, another energy consumption is the lamp. In the program design, the lighting circuit is triggered when the gate circuit is started, and the lighting circuit is automatically closed when the gate circuit does not move for more than 5 minutes, so as to realize the energy-saving control of the lighting.

The purification engineering air shower equipment produced by our company has the characteristics of low power consumption, stable and reliable operation performance, and advanced noise reduction and silence device soundproof system. Purification engineering air shower equipment adopts special air duct and uniform air series design, deceleration less eddy current, remove noise, guide air flow through the filter screen, with uniform wind speed, low noise characteristics. Once launched, by a wide range of enterprises love. But then again, there are more and more problems in the purification engineering air shower equipment on the market, leading to buyers difficult to choose the right air shower equipment; The off-brand air shower room has many shortcomings, such as: loud noise, high power consumption, parts are easy to damage and other problems. The different material of the air shower will directly affect the cost of the air shower. If the workshop has acid gas or relatively wet, it is recommended to choose all stainless steel air shower, so as to ensure the effectiveness of the purification project. In the same size and configuration, the air shower material is full sanding stainless steel and full sanding stainless steel price cost is very different, so enterprises according to their own and process requirements, choose to buy different air shower. If the number of purification engineering workshop is not much or less than ten people, you can consider using a single or double air shower, that is, one to two people can enter the air shower; If more than ten people in the workshop, you can consider using double or multiple air shower room. Therefore, in the installation of purification engineering air shower room need to pay attention to the following problems: the above is the purification engineering stroke shower room installation matters needing attention, in the use of the construction of air shower room in purification engineering, should pay attention to the above problems, so as to ensure the purification effect of the air shower room.

Xinruizhen (xiamen) purification technology co., LTD also undertake electronic, food, optics, precision instruments, operating room, biological pharmaceutical, pharmaceutical packaging materials, health products, food, cosmetics, water and other industries 10-- 300000 level purification projects, we will provide you with the best quality service.

Top